Phase I (Spring Clean-up) Cost   Total = $3,045          
Las Brisas Blvd. $1,510
Order 20 yards of mulch @ $20/yard $400
Prepare islands for mulching, pull weeds, clean curb tops $200
Spread mulch $700 Phase I  Total Cost $3,045 $3,045 Phase I Only
Clean up shoulder side of Las Brisas Blvd. and entrance corner $70 Phase II  Total Cost $4,460 $7,505 Phase I & II Only
Spray roundup on all weeds $70 Phase III  Total Cost $270 $7,775 Phase I, II, & III Only
Scrape up and Clean up Las Brisas Blvd. curbs $35 Phase IV  Total Cost $1,270 $9,045 Phase I, II, III, & IV Only
Scrape up Kresson-Gibbsborro shoulder curbs leading to entrance $35 Phase V  Total Cost $950 $9,995 Phase I, II, III, IV , & V
Courtland Drive $860
Order 10 yards of mulch @ $20/yard $200
Prepare area for mulching, pull weeds, and clean curb tops $100
Spread mulch $350
Clean up Homeowner’s corner of Courtland entrance $105
Spray roundup on all weeds $35
Scrape up and Clean up Courtland curbs $35
Scrape up Cooper Road shoulder curbs leading to and from entrance $35
Berkshire Drive $195
Order 1 yards of mulch for Berkshire  @ $20/yard $20
Rake up Debris from all winter, weed, and prep for mulching $35
Spread mulch around sign $35
Spray roundup on all weeds $35
Service Solar Powered Entrance Sign Lights $35
Scrape up Clean up Cooper Road curbs leading to entrance $35
Fund Raising & Administrative Costs $480
Annual cost for AlluviumWoods.com $15
First contribution postal mailing, envelopes, stamps, paper, copies $175
Second contribution postal mailing, envelopes, stamps, paper, copies $140
Third contribution postal mailing, envelopes, stamps, paper, copies $100
Annual Corporation filing fee $50
Phase II (Repairs & Regular Maintenance) Cost   Total = $4,460          
Las Brisas Blvd. $2,735
Entrance Sign Maintenance $75
Clean and Service (3) Spot Lights $35
Mid summer Trimming and Pruning $150
Once every 2 weeks clean up: cleaning curbs, picking up sticks, debris, and litter.  26 weeks  x  $70/week $1,820
Once every month spray Roundup  3 x $35 $105
Fall final Trimming and Pruning $350
Fall clean up for winter, leaf removal. $200
Courtland Drive $1,490
Entrance Sign Maintenance $75
Service (2) Spot Lights $25
Mid summer Trimming and Pruning $100
Once every 2 weeks clean up including cleaning curbs, picking up
sticks, debris, and litter.  26 weeks  x  $35/week
$910
Once every month spray Roundup 3 x $35 $105
Fall final Trimming and Pruning $175
Fall clean up for winter, leaf removal. $100
Berkshire Drive $235
Entrance Sign Maintenance $75
Mid summer Trimming and Pruning. $0
Once every month clean up including cleaning curbs, picking up
sticks, debris, and litter.
$0
Once every month spray Roundup 3 x $20 $60
Fall final Trimming and Pruning $50
Fall clean up for winter, leaf removal. $50
Phase III (Minor Improvements) Cost   Total = $270          
Las Brisas Blvd. $150
Fix small island where rocks are falling into the street $50
Fertilize shrubs, bushes, and plants $100
Courtland Drive $120
Add a layer to inbound side of entrance stone retaining wall $70
Fertilize shrubs, bushes, and plants $50
Berkshire Drive $0
Phase IV (Use In-Ground Sprinklers) Cost   Total = $1,270          
Las Brisas Blvd. Sprinklers $710
Turn water on; account with American Water Co, $30
Monthly service charge with American Water for 6 months $60
Monthly water usage with American Water for 6 months $325
Turn water off; account with American Water Co. $30
System Winterization $65
Repairs to sprinkler system, fix leaks, adjust heads spraying water into street $200
Courtland Drive Sprinklers $560
Turn water on; account with American Water Co. $30
Monthly service charge with American Water for 6 months $60
Monthly water usage with American Water for 6 months $225
Turn water off; account with American Water Co. $30
System Winterization $65
Repairs to sprinkler system, fix leaks, adjust heads spraying water into street $150
Phase V (Major Improvements) Cost   Total = $950          
Las Brisas Blvd. $800
Install a hose spigot onto sprinkler system $150
Install electric service on the full length of the island. $650
Courtland Drive $150
Install a hose spigot onto sprinkler system $150
Berkshire Drive $0
ONLY to be considered if more donations come from that area of the neighborhood.