2015-16 Master Plan and Budget
Phase I (Spring Clean-up) Cost   Total = $3,030          
Las Brisas Blvd. $1,505
Spring Clean up Las Brisas Blvd. entrance $200
Clean up shoulder side of Las Brisas Blvd. and entrance corner $100
Spray roundup on all weeds $70 Phase I  Total Cost $3,030 $3,030 Phase I Only
Hire Landscaper to Mulch $1,100 Phase II  Total Cost $4,205 $7,235 Phase I & II Only
Scrape up Kresson-Gibbsborro shoulder curbs leading to entrance $35 Phase III  Total Cost $440 $7,675 Phase I, II, & III Only
Phase IV  Total Cost $1,270 $8,945 Phase I, II, III, & IV Only
Phase V  Total Cost $950 $9,895 Phase I, II, III, IV , & V
Courtland Drive $840
Spring Clean up Courtland entrance $100
Clean up Homeowner’s corner of Courtland entrance $70
Spray roundup on all weeds $35
Hire Landscaper to Mulch $600
Scrape up Cooper Road shoulder curbs leading to and from entrance $35
Berkshire Drive $205
Order 1 yards of mulch for Berkshire  @ $30/yard $30
Rake up Debris from all winter, weed, and prep for mulching $35
Spread mulch around sign $35
Spray roundup on all weeds $35
Service Solar Powered Entrance Sign Lights $35
Scrape up Clean up Cooper Road curbs leading to entrance $35
Fund Raising & Administrative Costs $480
Annual cost for AlluviumWoods.com $15
First contribution postal mailing, envelopes, stamps, paper, copies $175
Second contribution postal mailing, envelopes, stamps, paper, copies $140
Third contribution postal mailing, envelopes, stamps, paper, copies $100
Annual Corporation filing fee $50
Phase II (Repairs & Regular Maintenance) Cost   Total = $4,205          
Las Brisas Blvd. $2,590
Entrance Sign Maintenance $70
Clean and Service (3) Spot Lights $35
Mid summer Trimming and Pruning $150
Once every 2 weeks clean up: cleaning curbs, picking up sticks, debris, and litter.  24 weeks  x  $70/week $1,680
Every other month spray Roundup  3 x $35 $105
Fall final Trimming and Pruning $350
Fall clean up for winter, leaf removal. $200
Courtland Drive $1,415
Entrance Sign Maintenance $70
Service (2) Spot Lights $25
Mid summer Trimming and Pruning $100
Once every 2 weeks clean up including cleaning curbs, picking up
sticks, debris, and litter.  24 weeks  x  $35/week
$840
Every other month spray Roundup 3 x $35 $105
Fall final Trimming and Pruning $175
Fall clean up for winter, leaf removal. $100
Berkshire Drive $200
Entrance Sign Maintenance $70
Mid summer Trimming and Pruning. $0
Once every month clean up including cleaning curbs, picking up
sticks, debris, and litter. 
$0
Every other month spray Roundup 3 x $20 $60
Fall final Trimming and Pruning $35
Fall clean up for winter, leaf removal. $35
Phase III (Minor Improvements) Cost   Total = $440          
Las Brisas Blvd. $250
Fix small island where rocks are falling into the street $150
Fertilize shrubs, bushes, and plants $100
Courtland Drive $190
Trim down Plants directly in front of Entrance Sign $70
Fertilize shrubs, bushes, and plants $50
Trim back the woods along the Courtland Entrance shoulder $70
Berkshire Drive $0
Phase IV (Use In-Ground Sprinklers) Cost   Total = $1,270          
Las Brisas Blvd. Sprinklers $710
Turn water on; account with American Water Co, $30
Monthly service charge with American Water for 6 months $60
Monthly water usage with American Water for 6 months $325
Turn water off; account with American Water Co. $30
System Winterization $65
Repairs to sprinkler system, fix leaks, adjust heads spraying water into street $200
Courtland Drive Sprinklers $560
Turn water on; account with American Water Co. $30
Monthly service charge with American Water for 6 months $60
Monthly water usage with American Water for 6 months $225
Turn water off; account with American Water Co. $30
System Winterization $65
Repairs to sprinkler system, fix leaks, adjust heads spraying water into street $150
Phase V (Major Improvements) Cost   Total = $950          
Las Brisas Blvd. $800
Install a hose spigot onto sprinkler system $150
Install electric service on the full length of the island. $650
Courtland Drive $150
Install a hose spigot onto sprinkler system $150
Berkshire Drive $0
ONLY to be considered if more donations come from that area of the neighborhood.