Phase I (Spring Clean-up and Administration) Cost   Total = $3,020          
Las Brisas Blvd. $1,590
Spring Clean up Las Brisas Blvd. entrance $200
Clean up Exit side of Las Brisas Blvd. and entrance corner $50
Spray roundup on all weeds $55 Phase I  Total Cost $3,020 $3,020 Phase I Only
Hire Landscaper to Mulch $1,250 Phase II  Total Cost $3,090 $6,110 Phase I & II Only
Clean up Kresson-Gibbsborro shoulder curbs leading to entrance $35 Phase III  Total Cost $970 $7,080 Phase I, II, & III Only
Phase IV  Total Cost $1,270 $8,350 Phase I, II, III, & IV Only
Phase V  Total Cost $950 $9,300 Phase I, II, III, IV , & V
Courtland Drive $885
Spring Clean up Courtland entrance $105
Clean up Homeowner’s corner of Courtland entrance $55
Spray roundup on all weeds $25
Hire Landscaper to Mulch $675
Clean up Cooper Road shoulder curbs leading to and from entrance $25
Berkshire Drive $280
Spring Clean up Berkshire entrance $35
Hire Landscaper to Mulch $150
Spray roundup on all weeds $35
Service Solar Powered Entrance Sign Lights $35
Clean up Clean up Cooper Road curbs leading to entrance $25
Fund Raising & Administrative Costs $265
Annual cost for AlluviumWoods.com $15
First contribution postal mailing, envelopes, stamps, paper, copies $195
Second contribution postal mailing, envelopes, stamps, paper, copies $0
Third contribution postal mailing, envelopes, stamps, paper, copies $0
Annual Corporation filing fee $55
Phase II (Repairs & Regular Maintenance) Cost   Total = $3,090          
Las Brisas Blvd. $1,795
Entrance Sign Maintenance Stone wall repairs $150
Clean and Service (3) Spot Lights $35
Mid summer Trimming and Pruning $150
Once every 3 weeks clean up: cleaning curbs, picking up sticks, debris, and litter.  12 cleanups  x  $50-$70 per cleanup (2 man-hours x $35/hr) $720
Every other month spray Roundup  3 x $35 $105
Fall final Trimming and Pruning $350
Fall clean up for winter, leaf removal. $285
Courtland Drive $1,010
Entrance Sign Maintenance Stone wall repaired $70
Service (2) Spot Lights $25
Mid summer Trimming and Pruning $100
Once every 3 weeks clean up: cleaning curbs, picking up sticks, debris, and litter.  12 cleanups  x  $25-$35 per cleanup (1 man-hours x $35/hr) $360
Every other month spray Roundup 3 x $35 $105
Fall final Trimming and Pruning $175
Fall clean up for winter, leaf removal. $175
Berkshire Drive $285
Entrance Sign Maintenance $70
Mid summer Trimming, Pruning, Weeding. $35
Late summer clean up including cleaning curbs, picking up
sticks, debris, and litter, Weeding
$55
Every other month spray Roundup 3 x $20 $45
Fall final Trimming and Pruning $35
Fall clean up for winter, leaf removal. $45
Phase III (Minor Improvements) Cost   Total = $970          
Las Brisas Blvd. $750
Replace Plants that Died, Tree Trimming dead branches $500
Fertilize shrubs, bushes, and plants $100
Replace any Dead Entrance Sign Lights $150
Courtland Drive $220
Trim down Plants directly in front of Entrance Sign, Tree Trimming dead branches $70
Fertilize shrubs, bushes, and plants $50
Replace (2) Entrance Sign Lights $100
Berkshire Drive $0
Phase IV (Use In-Ground Sprinklers) Cost   Total = $1,270          
Las Brisas Blvd. Sprinklers $710
Turn water on; account with American Water Co, $30
Monthly service charge with American Water for 6 months $60
Monthly water usage with American Water for 6 months $325
Turn water off; account with American Water Co. $30
System Winterization $65
Repairs to sprinkler system, fix leaks, adjust heads spraying water into street $200
Courtland Drive Sprinklers $560
Turn water on; account with American Water Co. $30
Monthly service charge with American Water for 6 months $60
Monthly water usage with American Water for 6 months $225
Turn water off; account with American Water Co. $30
System Winterization $65
Repairs to sprinkler system, fix leaks, adjust heads spraying water into street $150
Phase V (Major Improvements) Cost   Total = $950          
Las Brisas Blvd. $800
Install a hose spigot onto sprinkler system $150
Install electric service on the full length of the island. $650
Courtland Drive $150
Install a hose spigot onto sprinkler system $150
Berkshire Drive $0
ONLY to be considered if more donations come from that area of the neighborhood.